INDUSTRIAL WASTEWATER TREATMENT SUPERFUND SITE

Executive Summary: Kredit Automation & Controls did a retrofit to upgrade the controller and operator interface at the Indian Bend Wash area superfund site. This is a treatment facility that removes volatile organic compounds from contaminated groundwater.  KAC improved the control by upgrading the feedback control loop maintaining the level in the main collection tank. The overall reliability and maintainability was improved by upgrading to the latest PLC technology offered by Rockwell Au